Introducing the first picture house construction process.
On the basis of plastic lined with all the details that will be used to create the wiring.
At the base of the recess is made under the pond.
In this photo, I have already installed base, ready to columns under the veranda and filled up the pond bottom. I want to jump ahead a bit, to show the general plan of the base. In height, it is about 5 cm. Inside will be laid communication and put on top of the house itself.
I begin wiring. Glue and solder must be all at once, so you can close the lid the foundation on which the house will stand. I’m not puzzled ergonomics and pre-wiring is not thought through all the stages of attachment, so I have a lot of extra connector assemblies. All communications will still be hidden in the ground. Based on this, I just enjoyed the soldering process.
Side at the base, make an indentation where the power plug is stuck. Nearby were attached switches. The first will turn on the lights on the first floor, the second in the attic. Separate switch powers the stove on the first floor – it will be built into the furnace.
So, to return to a pond. Here you can see how I edit his wall.
After cutting extra pieces of the wall turned a pond. I fell asleep with sand bottom.
I turn to the creation of the foundation. He tapes cement in the original. As in his life he just gray, I decided to make a mock red brick lining. I am sure the whole structure will look more spectacular than in real life.
Pond finished. One of its walls covered with stones, others just sand.
This photo stone wall can be clearly seen.
I painted the base color of the ground. In the future, the grass will grow here. Painted now, so you do not suffer, crawled from under the brush ready fundament on the veranda.
The very foundation has already purchased a brick color.
Created lags, which spreads the floorboard. Paul first floor is ready for installation.
It has begun laying the floor on the veranda.
In parallel, I do pay at wiring at the base.
On the right photo, you can see a black charging for the phone. It will supply the entire building.
I continue laying the floor. Joints boards sanded.
I begin with the installation guide for the first floor.
If you look closely, you can see that on the veranda each do Sochi nailed to the ground with small nails. This technology, I borrowed the model ship.
I also glued the porch.
To comply with the proportions I cut a piece of white plastic, which is equal to the average growth of man -. 170 cm Now he lies on the floor of the porch.
Then I stick the door jambs. In the future, they are glued door.
Already now it is necessary to think about the furnace, which will be on my first floor.
Actually creating the stove and I was engaged. The rear of the oven and leave the sauna will not be visible, so you can not do it.
In the furnace, I mount the red LED, which will illuminate the wood and create the effect of a lit flame.
Yet unpainted furnace has taken its place in the house. Now you can collect around her walls.
The stove is painted. Black hole gapes firebox – requests that she put the wood and set on fire.
To paint the stove I mixed red paint, brown, adding a little gold. The result was a very interesting color brick. The back of it makes no sense to paint, so she was white.
Around the stove, wall grow.
Lifting the inner walls. At the same time create a staircase to the second floor.
In the furnace of the stove-fireplace is integrated red light. Remaining for a complete simulation only put it in the wood. And when the walls in the house will be ready, the red light from the furnace on the floor will be more noticeable. This adds realism.
Already inserted an inner window frame with glass. Its on the photo is not visible, but it is.
Already built half of the first floor.
Glued interior doors. One of the vestibule with the glass, the second in the bathroom – opaque.
It created the first flight of stairs.
I begin to furnish the house. First I created a kitchen table-stands. Inside can be hidden kitchen utensils.
The next piece of furniture – leather sofa.
The firebox of the furnace, the red LED illuminated, languishing embers. When the wall of the house will be raised and will be located on top of the ceiling, the stove will comfortably cover the space of the room. Warming inhabitants of the house, the warm light will brighten the long winter evenings.
The walls of the first floor are almost summed up under the ceiling. In the foreground can be seen in the walls of the hole. When the wall will be lined up to the end, in these places will be cut openings for doors and windows.
I insert the plastic windows. Basis – plastic top oak veneer 1 mm frames – birch veneer 0.6 mm. From the inside of the clear plastic.
The next two windows in the vestibule, hallway.
I collect a small round table, which will stand in the hallway.
I begin with the installation of an entrance. At the center of the front door, on the edges of the window.
Windows is fully made.
The front door will be opened.
Final assembly of the door. Clay small hand.
Before you mount the door it is necessary to paste the furniture in the hallway. A small table and shelves.
The door is ready. It turned out great as you think?
Getting light wiring. Between the ceiling of the first floor and the second floor will be laid wiring.
The first floor is ready. The view from the veranda.
If you look out the window, you can see the melted stove. When installed in the ceiling and the room was dark, the fireplace looks particularly striking.
I collect firewood in the bundle. I glue it near the stove.
In parallel light. Guess what I have made chandeliers?
Clay chandeliers to the ceiling. The ceiling of oak veneer.
The ceiling is completely installed. The holes on top – a place of mounting LEDs.
Posting is brought. I begin to lay the floor of the second floor.
A load of cans with rocks pressing on the floorboards until they are stuck.
Half of the floor is ready. Above the entrance door displayed a wire for the organization of the world on the veranda.
It is time to check how the coverage. This is the light in the hallway.
Light in the room.
Due to the fact that the front door glass and flanked by two large windows the light from the hall will cover a part of the veranda.
Continue to glue the floor. Wires for lighting the second floor will be hidden in the chimney.
The real house there is a terrace. His hozyaiva only thinking to do a large covered veranda or porch.
I svoee in construction went a little further – creating a terrace with a covered section.
Clay frame covered part and deduce the wiring for the lights. In bad weather or summer evenings will be cool to sit outside.
terrace ceiling will be made of oak veneer. At the center of the hole for the LED.
Glued ceiling.
Looking ahead, I want to note that in all the rooms of this house established the ceiling. A space between the floor and the ceiling, I use to create a hidden wiring.
From below the ceiling adhesive cover. To the hole in the ceiling and the chandelier is not “up lilo”, insert a vertical skewer .
Once the wiring is done, I create a roof.
The result was a terraced carport. A small protrusion from the rain closes the porch steps.
Actually, the ceiling light above the entrance.
So extension looks from the outside. At the final stage of finishing here will be some kind of furniture and fences.
Let’s go back inside the house. Paul attic floor is ready, so it’s time to take care of the second part of the ladder.
Slowly begin to raise the walls of the attic floor.
Upstairs we have three rooms: a large bedroom, a vestibule and a small room of rest. Now I separate the bedroom from the rest of the premises.
I put a vertical frame. Since this is not a full floor, and attic only, the side walls are shorter. Hence only two frame walls.
Next, glue the triangles, which goes the roof.
As on the first floor, there will be a little bit of furniture. A little bit because I do focus on the house itself, rather than the interior.
I build a double bed.
Blanketed bed integers iridescent material. In the photo it is green, but in the life nice poured from green to blue.
The side walls are almost ready. Soon it will be possible to engage the ceiling.
Another element of the attic – the closet.
Modest decorations attic bedrooms.
Cabinet took his place in the decoration of the room. To revive the situation, I made the cabinet door slightly open.
In the vestibule will be installed fencing to tenants of the house did not fall down the stairs.
Above seen fenced and fixed staircases.
Cut openings for the windows of the second floor. One window in the rest room, the second goes to the stairs.
The room is separated from the rest vestibule doorway. In life, there is the door, but I decided to leave the doorway free.
At the center of the picture, one can see the wires for lighting the attic floor. I decided to bring them out of the basement / pedestal through the chimney.
The recreation room is a chair. It is convenient to sit, read a book or just contemplate the landscape through the panoramic windows.
Cut window frames.
In the background is inserted plastic door and on the front, you can see the frame of the roof window.
I began to mount the ceiling.
A window in the roof. It will be opened. Everything in this house.
Window mounted. Now you can dole it ceiling and put the roof.
Wiring, as I said, I have hidden in the chimney and leaves pryamёhonko in the attic space.
If you look through the skylight in the bedroom, you can see the interior.
I continue to work on the attic ceiling. It is made from oak veneer.
Work on the ceiling behind. Provision is made, the LEDs are glued to the ceiling. From the inside of the rooms are also glued chandeliers.
I begin to glue the roof on the right side of the house.
The bottom row of the roof is glued. It remains uncovered only attic space. It is now possible to see how the wiring goes.
And this is the left side of the roof. She was already smotntirovana earlier. Now you can paint the roof, close the ends, and so on.